A-FLOW ML1

A-FLOW (FLOW × AyalaLand Logistics)

Live
Operator
A-FLOW (FLOW × AyalaLand Logistics)
Location
Biñan, LagunaLuzon
Status
Live
IT capacity
6 MW
Confidence
Confirmed

Scale and certification

Launched 28 November 2025. Phase one of a three-building, 36 MW carrier-neutral campus. Broke ground Dec 2022, topped off Sept 2024.

Where it sits

A-FLOW ML1 is one of 14 tracked facilities in Luzon, of which 10 are operating today. A-FLOW (FLOW × AyalaLand Logistics) has one facility in this directory. This site is live and taking load.

How solid is this?

The operator disclosed these details, or a primary source reported them directly. Still worth confirming with the operator before you use them commercially — capacity changes as sites expand.

Source: The Philippine Data Center Atlas, 29 July 2026. Send a correction.