Data centers / Luzon
A-FLOW ML1
A-FLOW (FLOW × AyalaLand Logistics)
Live- Operator
- A-FLOW (FLOW × AyalaLand Logistics)
- Location
- Biñan, Laguna — Luzon
- Status
- Live
- IT capacity
- 6 MW
- Confidence
- Confirmed
Scale and certification
Launched 28 November 2025. Phase one of a three-building, 36 MW carrier-neutral campus. Broke ground Dec 2022, topped off Sept 2024.
Where it sits
A-FLOW ML1 is one of 14 tracked facilities in Luzon, of which 10 are operating today. A-FLOW (FLOW × AyalaLand Logistics) has one facility in this directory. This site is live and taking load.
How solid is this?
The operator disclosed these details, or a primary source reported them directly. Still worth confirming with the operator before you use them commercially — capacity changes as sites expand.
Source: The Philippine Data Center Atlas, 29 July 2026. Send a correction.