DH MNL1

Digital Halo

Live
Operator
Digital Halo
Location
Cainta, RizalLuzon
Status
Live
IT capacity
6.5 MW
Confidence
Confirmed

Scale and certification

Live 3 June 2025. First of three buildings on a planned 70 MW campus. Designed to run on 100% renewable energy — geothermal and wind. $46.9M project financing secured.

Where it sits

DH MNL1 is one of 14 tracked facilities in Luzon, of which 10 are operating today. Digital Halo has one facility in this directory. This site is live and taking load.

How solid is this?

The operator disclosed these details, or a primary source reported them directly. Still worth confirming with the operator before you use them commercially — capacity changes as sites expand.

Source: The Philippine Data Center Atlas, 29 July 2026. Send a correction.