VITRO Cavite

ePLDT / PLDT

Building
Operator
ePLDT / PLDT
Location
General Trias, CaviteLuzon
Status
Building
IT capacity
100 MW
Confidence
Confirmed

Scale and certification

₱40B, 12th ePLDT site. Five prefabricated modules, phased from 20 MW. Construction 2026, completion targeted 2028. PLDT targets +500 MW portfolio-wide.

Where it sits

VITRO Cavite is one of 14 tracked facilities in Luzon, of which 10 are operating today. ePLDT / PLDT runs 11 of the 40 facilities in this directory. This site is under construction, so its capacity is not available yet.

How solid is this?

The operator disclosed these details, or a primary source reported them directly. Still worth confirming with the operator before you use them commercially — capacity changes as sites expand.

Other ePLDT / PLDT facilities

Source: The Philippine Data Center Atlas, 29 July 2026. Send a correction.