ailiteracy/ph

Data centers / Metro Manila

VITRO Makati 1

ePLDT / PLDT

Live
Operator
ePLDT / PLDT
Location
MakatiMetro Manila
Status
Live
IT capacity
0.4 MW
Confidence
Reported

Scale and certification

202 racks across 580 sqm. Hurricane Electric PoP since 2023.

Where it sits

VITRO Makati 1 is one of 16 tracked facilities in Metro Manila, of which 13 are operating today. ePLDT / PLDT runs 11 of the 40 facilities in this directory. This site is live and taking load.

How solid is this?

These details come from an aggregator or analyst listing that has not been independently checked. Treat them as a lead, not a fact, and confirm with the operator before relying on them.

Other ePLDT / PLDT facilities

Source: The Philippine Data Center Atlas, 29 July 2026. Send a correction.